1. ACCOUNTS EXECUTIVE
2. MANAGER, FINANCE & TREASURY
3. SUPERVISOR
4. HEAD OF ENGINEERING & MAINTENANCEM MECHANICAL&ELECTRICAL&ELECTRONIC (M&E/E)
5. PERONDA LEBUHRAYA (MOTOSIKAL)
6. PERONDA LEBUHRAYA (PATROLMAN)
Tarikh tutup permohonan pada 31 Mac 2016
Lokasi : Selangor
Sektor : Swasta
KESAS Sdn Bhd was formed in September 1993 to finance, design, construct, operate, maintain and collect toll for the Lebuh Raya Shah Alam (LSA) for 28 years and 9 months.
Lebuh Raya Shah Alam was constructed in 1994. It was divided into 2 phases that is Package A and Package B with a total length of 34.5 km. Package A (from Sri Petaling to Seafield interchange linking KLIA - 17 km) was opened to traffic in December 1996 about 4 months ahead of schedule. Package B (from Seafield interchange to Pandamaran interchange - 17.5 km) was opened to traffic in April 1998 as scheduled.
KESAS is managed by highly skilled, experienced and professional personnel who are trained in various disciplines. It has a proven track record for the Built, Operate and Transfer (BOT) of LSA and was accredited and awarded the prestigious MS ISO 9002:1994 quality management system on 1 February 2000 for the management and operations of the LSA.
Jom follow kami di facebook sekarang dan dapatkan info terkini terus ke wall facebook anda